An old deck can go from eyesore to empty yard in a weekend, but the lumber pile it leaves behind is bigger than most people expect. A little planning makes the tear-out faster and the cleanup painless.
Plan the Demo
- Check what’s attached. Look for lights, outlets or gas lines near the deck before you start pulling boards.
- Work top down. Railings and decking first, then joists and beams, then posts.
- Gather the right tools. A pry bar, reciprocating saw, cordless drill and heavy gloves cover most jobs.
- Watch the fasteners. Old decks are full of nails and screws. Wear sturdy boots and keep kids and pets away.
How Much Debris Does a Deck Make?
Decking boards, railings, joists and posts add up fast, and lumber is awkward to stack. Cutting long boards into shorter lengths before loading lets them lie flat and packs the dumpster tighter.
Deck removal is one of the jobs our 15 yard dumpster is built for. It measures 11′ × 8′ × 4.5′ and holds about 5–6 pickup loads (approximate). A small landing or a short run of stairs may fit in a 10 yard.
Concrete Footings
If you’re pulling out concrete footings or a patio slab too, remember that concrete is heavy material, and heavy material goes only in the 6 yard dumpster. Plan a separate bin for concrete if you have a lot of it. The Janesville landfill doesn’t accept concrete either.
Placement Tips
- Put the bin as close to the backyard as the driveway allows.
- Lay a tarp along the path to catch nails and splinters.
- Run a magnet over the lawn when you’re done.
Every rental includes driveway protection: the dumpster sits on boards, not directly on your driveway.